
Exchange Information Requirements: The Rulebook of Your BIM Project
Ever signed a contract for a BIM project only to realize you have no idea what data the client actually
🔥🔥 6th Edition of Become BIM Coordinator is NOW OPEN 🔥🔥
The most comprehensive online training about BIM Coordination – REGISTER HERE
🎓 ENROLLMENT NOW OPEN🔥 Master IFC 4.3 in Infrastructure in 6 Weeks🔥
Open Until 📅March 8, 2026 🕑21:00 CET
Join the IFC 4.3 MASTERCLASS HERE
🎓 ENROLLMENT NOW OPEN🔥 Master IFC & OpenBIM in 5 Weeks
Open Until 📅December 4, 2025 🕑21:00 CET
Join the IFC MASTERCLASS HERE

Ever signed a contract for a BIM project only to realize you have no idea what data the client actually

Defining roles and responsibilities in a BIM Execution Plan (BEP) is a critical step that is often underestimated. After establishing

A BEP (BIM Execuction Plan) requirement is not useful if nobody can clearly check it.
In this article I want to talk about a practical skill that saves BIM Coordinators a lot of time. It is the ability to turn requirements from the BEP or EIR into rules that produce a clear pass or fail result.

In the infrastructure industry, it is very common to hear that “IFC does not work”. This statement appears in conversations

Grasshopper-Tekla Live Link 2026 brings some of the most practical workflow improvements we have seen in a while. From better

I want to talk about something that has bothered me for a long time:
– the ripple effects of poor coordination in multi-disciplinary teams,
– why often “coordinated” BIM model might be a ticking time bomb,
– and how a 20cm mistake in the design phase snowballs into millions $ USD in project losses.

Why stop at design? In the first part, we explored how IFC supports design, coordination, and construction preparation. But the

Python can be a game changer in AEC. It can help automate repetitive tasks, connect software, process data faster, and

As consultants at BIM Corner, we see the exact same scenario play out dozens of times a year. A mid-sized

When I first stepped onto the construction site as a design manager and BIM responsible, I thought IFC files were

You’re in a coordination meeting.
Your federated model is on the big screen, glowing with red, green, and yellow clashes. An hour passes. Then two. The conversation goes in circles, architects debating with engineers, electricians “blaming” plumbers. You click through hundreds of clashes, each one a tiny battle in a war you feel you’re losing.


If you coordinate BIM projects in Revit, IFC links have probably been a pain.
I speak with many BIM coordinators and managers who work in Revit. Many deliver openBIM projects where IFC is the standard exchange format.


If you work with IFC and want an alternative toolset, this is for you. Maybe you’re not thrilled with Revit
Do you want to learn BIM ?
Join our community
Do you want to learn BIM ?
JOIN OUR COMMUNITY
Copyright © 2025 BIM Corner. All Rights Reserved.
You have successfully joined our subscriber list. Check your inbox. Confirm email in order to get access BIM Case Studies from the biggest Norwegian projects.
After reading this guide, you will learn:
Every Thursday you will get a package of news and useful links from the BIM world.
Just real content that’s meant to make a difference in your BIM knowledge.