
Can you trust AI with IFC properties? 4 ways it makes them up
Think back to the last time you received a Level of Information Need document in an Excel spreadsheet. Hundreds of
🔥🔥 6th Edition of Become BIM Coordinator is NOW OPEN 🔥🔥
The most comprehensive online training about BIM Coordination – REGISTER HERE
🔥🔥 3rd Edition of Grasshopper in Tekla Training is NOW OPEN 🔥🔥
Stop wasting hours on manual Tekla clicks – REGISTER HERE
Enrolment closes in
IFC Infrastructure Masterclass, Edition 2
Six live workshops from 26 October. In Workshop 6, AI (Claude Code and Codex) writes your IDS checks and IFC scripts, and you learn to verify them. No programming background needed.
See the programme →From €459 · 14-day money-back guarantee
🎓 ENROLLMENT NOW OPEN🔥 Master IFC & OpenBIM in 5 Weeks
Open Until 📅December 4, 2025 🕑21:00 CET
Join the IFC MASTERCLASS HERE
Free live webinar · Mon 14 Dec · 19:00 CET
99 IFC 4.3 concepts. Which ones are worth your attention?
One evening on a real IFC 4.3 corridor, live with Marcin Pszczółka. Free, on YouTube Live.
One more click and your seat is saved
Check your inbox and click the confirmation link. Nothing there? Look in spam.
▶ Watch the replay: IFC 2x3 vs IFC 4.3Add 14 December, 19:00 CET to your calendar

Think back to the last time you received a Level of Information Need document in an Excel spreadsheet. Hundreds of

IFC 4.3 is built from 99 concepts. One real bridge pier carries 18 of them. The Alignment-based View asks for 64, the Reference View for 51, and IDS can check 22. What a concept is, in plain words and real file lines.

If you work in Revit, this is one of the most useful practical questions you can ask. Together with Gavin

One 87 m bridge exported three ways. Five searches in a text editor, four questions to the model, the coordinate that breaks every viewer, and two mistakes I found in my own best file.

An IFC 4.3 bridge that says nothing about time, a free copy of Bonsai, and 13 steps: add a construction schedule, link it to the geometry and render an MP4 of the bridge being built. Every step has a real screenshot with the click targets marked.

Here is an uncomfortable truth: people don’t bypass your CDE because they are lazy or incompetent.
Under intense project pressure (which happens quite often), human behavior dictates that we will always choose the fastest path of least resistance.

Open an infrastructure IFC file that came back from a client with corrections. Before you look at the geometry, look

Most structural engineers still create two separate models: one detailed model for BIM and another simplified model for structural analysis.

It is Friday afternoon and a new model revision lands on the CDE. You know roughly what the client asked

When industry professionals talk about digital transformation in construction, they usually imagine BIM coordinators sitting in air-conditioned site offices, clicking

In the Age of AI, the winner won’t be the best clicker – it’ll be whoever understands information For the

Rhino and Grasshopper were not originally built for buildings, BIM, or structural analysis. Rhino began as a tool for accurate,

“It’s a continuation. Most of the requirements stay the same. Should be quick.” That’s what we told ourselves at the

When I first stepped onto the construction site as a design manager and BIM responsible, I thought IFC files were

Here is an uncomfortable truth: people don’t bypass your CDE because they are lazy or incompetent.
Under intense project pressure (which happens quite often), human behavior dictates that we will always choose the fastest path of least resistance.
You have successfully joined our subscriber list. Check your inbox. Confirm email in order to get access BIM Case Studies from the biggest Norwegian projects.
After reading this guide, you will learn:
Every Thursday you will get a package of news and useful links from the BIM world.
Just real content that’s meant to make a difference in your BIM knowledge.